New Office IT Setup

New Office IT Setup and Fit-Out

Cabling, network, firewall, workstations, printing, phones and accounts — delivered as one project against your move-in date, so staff arrive to systems that already work.

Timing

The Best Time to Involve Us Is Before the Lease Is Signed

Two questions decide most of a fit-out's cost, and both are answered by the building.

What internet services can actually be delivered to that address, and how long they take to install, is the single most common cause of a delayed move. Lead times of several weeks are normal and cannot be compressed once the clock starts.

The second is what the building permits: cable routes, riser access, ceiling work, out-of-hours access. A floor plate that looks straightforward can be considerably more expensive to cable than the one next door. Knowing both before signing changes what you negotiate.

An office workstation at night with a monitor, laptop and desk phone beside a lit server rack, overlooking the Los Angeles skyline
Scope

What a Fit-Out Covers

One project, one contact, one date everything has to work by.

Infrastructure

Workplace

Accounts & Data

We coordinate with the landlord, the electrician and your furniture installer directly. Fit-outs fail at the handovers between trades, not within them.

Delivery

How a Fit-Out Runs

Working backwards from your move-in date, because the connectivity lead time sets everything else.

Survey and Feasibility

The floor walked, connectivity options confirmed, landlord constraints established.

Design and Schedule

Layout, cable schedule, equipment list and a dated schedule working back from move-in.

Order Long-Lead Items

Internet service and any equipment with a lead time, ordered first and tracked.

Install Infrastructure

Cabling, rack, switching, Wi-Fi and firewall — before furniture wherever possible.

Deploy Workstations

Machines built, accounts created, printing and meeting rooms configured and tested.

Go Live and Support

On site for the first working day, then documented handover and follow-up.

FAQ

Fit-Out Questions

Lead times, cost, landlords and being there on day one.

Still not sure?

Describe the problem and we will tell you what it takes to fix it — before any work starts.

How far ahead should we start?

Six to eight weeks before move-in for a typical small office, and earlier if the building has no existing business connectivity. Internet installation lead times are the constraint, and no amount of planning shortens them once ordered late.

As a fixed project price against a defined scope, agreed after the survey. Changes you request during the project are quoted as variations rather than absorbed silently and invoiced at the end.

Yes. Consents, access arrangements, riser permissions and out-of-hours working are all part of what we handle, and establishing them early is usually what keeps a schedule on track.

Yes. A technician is present for the first working morning — that is when the small things surface, and having someone there turns them into minutes rather than a week of tickets.

We expect to. Cabling before furniture and after electrical rough-in is the usual sequence, and we coordinate the handovers directly rather than through you.

You get documentation, credentials and a follow-up visit. Many clients move onto a managed arrangement at that point — see Managed IT Services — but there is no obligation to.

Service Areas

On-Site Service Across Los Angeles, Glendale & the San Fernando Valley

We travel to homes and offices across the Los Angeles area. If your address is nearby but not listed, ask when you get in touch.

Map of the Los Angeles area marking the five MCRP on-site service areas: Santa Clarita, Simi Valley, San Fernando Valley, Glendale and Los Angeles
Get Started

Plan an Office Fit-Out

Tell us the address, the floor size and the move-in date. The earlier the survey, the fewer surprises.